Industrial Solar

Home/Services/Industrial Solar

C&I

Industrial Solar

Slash your industrial power bill and hedge against tariff hikes with captive solar.

Capacity

100 kW – 5 MW

Models

CAPEX / OPEX / RESCO

Bill offset

Up to 70%

Payback

3–4 years

OVERVIEW

Why choose Flash for industrial solar

Our C&I solutions serve factories, warehouses, cold storage and data centres — with HT-side integration, peak-demand offset and open-access enablement.

We deliver CAPEX, OPEX and RESCO models to match your CFO's balance-sheet strategy.

Every industrial installation is engineered around your load curve and shift pattern — maximising self-consumption and minimising grid dependency.

KEY FEATURES

What's included

  • 100 kW – 5 MW captive plants
  • HT / LT integration with load synchronisation
  • Peak-demand and MD reduction analysis
  • CAPEX, OPEX and RESCO commercial models
  • Open-access and group-captive structuring
  • ISO 14001 & IEC compliant engineering

KEY BENEFITS

What you gain

01

Hedge tariff hikes

Lock 25-year power cost against 5–8% annual DISCOM inflation.

02

Tax benefits

80% accelerated depreciation in year one under Section 32.

03

ESG & RE100 credits

Reportable Scope 2 emissions reduction and green-power certification.

04

Zero downtime install

Weekend and shutdown-window cutovers with zero production impact.

GALLERY

Project imagery

Industrial Solar gallery 1
1 / 6

HOW WE DELIVER

Our process

1

Energy Audit

2

Commercial Model

3

Engineering

4

Execution

5

O&M

TECHNOLOGY STACK

Best-in-class components

We only use Tier-1, MNRE-approved and internationally certified equipment.

N-type TOPCon modules String inverters (Sungrow SG, Huawei) HT synchronisation panels Reverse-power relays IoT energy dashboards

CASE STUDY

800 kW HT captive plant

Location

Andhra Pradesh auto-component factory

Capacity

800 kW dc

Result: 68% daytime load offset, ₹1.4 crore annual savings, 3.1-year payback with AD benefit.

View more projects

FAQ

Questions we hear a lot

CAPEX or OPEX — which is better?+

CAPEX suits companies with tax appetite (AD benefit); OPEX / RESCO suits those wanting zero investment with locked per-unit tariff.

Will solar affect my HT connection?+

No — we design reverse-power protection and synchronisation panels certified by every major DISCOM.

Can we scale up later?+

Yes — plants are engineered with expandable inverter and cable capacity so future additions are plug-and-play.

Ready for a industrial solar proposal?

Get a detailed quote with capacity sizing, ROI projection and delivery timeline — free within 48 hours.

Ready to power up with clean energy?

Talk to our engineers today — free site visit and proposal within 48 hours.