Ground-Mounted

Home/Services/Ground-Mounted

Utility

Ground-Mounted

Utility-scale ground-mounted solar farms engineered for maximum land productivity.

Capacity

500 kW – 10 MW+

Type

Fixed-tilt / Tracker

Delivery

4–9 months

PR

80%+ guaranteed

OVERVIEW

Why choose Flash for ground-mounted

We design and build MW-scale ground-mount plants with fixed-tilt or single-axis tracker systems — optimising GCR, string layout and land usage for the best LCOE.

From CTU/STU liaison to substation integration, Flash delivers plants ready for open-access or PPA offtake.

Our EPC-plus-O&M model means the same team that builds your plant runs it — with skin in the game for every year of the 25-year life.

KEY FEATURES

What's included

  • 500 kW – 10 MW+ utility plants
  • Fixed-tilt & single-axis tracker options
  • Geotech survey and pile foundation design
  • Central & string inverter architecture
  • 33/66 kV substation and evacuation
  • SCADA and remote plant monitoring

KEY BENEFITS

What you gain

01

Lowest LCOE

Optimised GCR and tracker choice cuts levelised cost by 10–15%.

02

Bankable structure

PPA, group-captive and open-access ready — lender approved.

03

Land-agnostic design

Solutions for undulating, saline and low-bearing soils.

04

Fast evacuation

In-house HT / substation team commissions grid tie-ins in weeks, not months.

GALLERY

Project imagery

Ground-Mounted gallery 1
1 / 6

HOW WE DELIVER

Our process

1

Land Study

2

PPA / OA Strategy

3

Detailed Engineering

4

Construction

5

Grid Sync

TECHNOLOGY STACK

Best-in-class components

We only use Tier-1, MNRE-approved and internationally certified equipment.

Bifacial 600 Wp+ modules Single-axis trackers (NEXTracker / Arctech) Central inverters 1500 V dc 33/66 kV GIS substation Fibre + wireless SCADA

CASE STUDY

5 MW open-access solar farm

Location

Karnataka wheeling site

Capacity

5 MW ac

Result: PR of 82.4% in year one — 6% above lender base case; open-access tariff locked for 25 years.

View more projects

FAQ

Questions we hear a lot

How much land do I need per MW?+

Roughly 4–5 acres per MW for fixed-tilt and 5–6 acres for single-axis trackers, depending on latitude.

Do you handle PPA and open-access approvals?+

Yes — our commercial team structures, files and closes PPA and OA agreements with DISCOMs and off-takers.

What financing options do you support?+

Debt through IREDA, PSU and NBFC lenders, plus RESCO, BOOT and group-captive equity models.

Ready for a ground-mounted proposal?

Get a detailed quote with capacity sizing, ROI projection and delivery timeline — free within 48 hours.

Ready to power up with clean energy?

Talk to our engineers today — free site visit and proposal within 48 hours.